|
- 语言编码 : 英文
- 软件版本 : sm400
- 资源类型 : 韩国原厂技术通告
- 非VIP会员请直接到三星贴片机综合讨论专区发帖提问。
- VIP用户可以直接联系技术支持QQ获取在线技术支持。
- 技术支持QQ:1504561681
- 开通VIP
Procedures required when replacing old SBC with SM400 series mass pro4 T7 y! A7 x0 S. M$ B9 H d) ]* a$ L
duction SBC.8 q! C- a+ w7 ~- l% \
1. Backup MMI fold of the existing equipment into D or E drive.8 O) E! S2 u5 ~0 f
2. Disconnect old SBC from rack." v* j2 b0 x2 e& B" J+ s
3. Disconnect cooler and memory from old SBC.
/ Q$ d8 {; T' m+ F% y0 X+ b4. Install new CPU at new SBC and assemble cooler disconnected from the existing SBC.- D7 a( H0 B2 T* I3 D8 w: C
(Never use Intel Cooler included in the box CPU because of weak durability.)
& d- W' w% V; l1 T) d4 J( _5. Mount the memory disconnected from old SBC.
% j: k% j9 b8 R1 f. C2 }( T' H6. Assemble SBC at rack and install the supplied Com Port bracket, if the facility uses IT,% J5 U4 o4 y5 R; W1 J/ a/ b
and connect it to SBC Com Port Connector.
* _" |2 m' o8 Z* P6 C' y; Y7. Receive SM400 Series XP Embedded SP3 ISO file from KT Hard, built Recovery DVD, and
8 |( K5 z' R8 ^9 ?9 Kthen install only OS at C drive of hard disk.( J, K! h, {1 X" \6 c, X. Y0 y5 t
8. After a completion of Recovery and PnP process, reboot again and install MMI.2 g7 K" q2 `' D
9. Overwrite system/PCB folder of back-up MMI into C:\SmartMMI.
; @* ]) `/ B5 j8 f8 Q10. Required Materials. ^3 |7 d! B( b* v4 B
( }5 n1 C% s# n( @0 S. n
/ Y" c; e3 h, Z$ Z* v |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即加入
x
|