|
- 语言编码 : 英文
- 软件版本 : sm400
- 资源类型 : 韩国原厂技术通告
- 非VIP会员请直接到三星贴片机综合讨论专区发帖提问。
- VIP用户可以直接联系技术支持QQ获取在线技术支持。
- 技术支持QQ:1504561681
- 开通VIP
Procedures required when replacing old SBC with SM400 series mass pro4 H/ p2 F0 x* m0 m
duction SBC.
$ a) G; N1 b! Z0 C" M1. Backup MMI fold of the existing equipment into D or E drive.
# {" X! H- Y7 z" W6 ]2. Disconnect old SBC from rack.
0 w4 U, k. ]0 g! {" S3. Disconnect cooler and memory from old SBC.4 e+ r" a2 l1 ?% O3 ^) @" F/ Y5 c
4. Install new CPU at new SBC and assemble cooler disconnected from the existing SBC.( {9 m+ x* ]8 V3 B: ^( Y" ^% ~9 ?+ t7 x. P
(Never use Intel Cooler included in the box CPU because of weak durability.)
9 F) S _" x, {. t5. Mount the memory disconnected from old SBC., I# V9 _- D& f" N& B
6. Assemble SBC at rack and install the supplied Com Port bracket, if the facility uses IT,
' G9 [ ~) w0 Land connect it to SBC Com Port Connector. X7 ^ O w J" c" F+ B
7. Receive SM400 Series XP Embedded SP3 ISO file from KT Hard, built Recovery DVD, and
& q. K6 d$ |) u. vthen install only OS at C drive of hard disk.
6 }! @! o( X6 k! C( V+ g9 \8 a4 n9 U8. After a completion of Recovery and PnP process, reboot again and install MMI.$ | ^; q A0 l/ G) @
9. Overwrite system/PCB folder of back-up MMI into C:\SmartMMI.3 H& w- {8 b) s5 i1 y5 @ O* a6 w
10. Required Materials
j$ R$ F# O4 I3 D: f; k! r0 u" e, a# Y
; N$ t# d2 |" Z) i7 ~4 S0 E0 ] |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即加入
x
|